|
MGA 1600
Here are more detail pictures of the sill/pillar replacement
The right B pillar support was cut away, then a patch panel tack
welded into place.
The panel was finish welded with the TIG welder, then the body
mounts were installed from the back side.
|
The inner sill was installed, then rustproofing was sprayed before
outer sill installation.
The sill and B pillar were installed using our spot welder.
The outer sill (rocker
panel) was spot welded into place. |
|